MAY 9TH, 2013

Boeing Rolls Out First 787 Dreamliner at Increased Production Rate

EVERETT, Wash., May 9, 2013 /PRNewswire/ — Boeing (NYSE: BA) has rolled out of the factory the first 787 Dreamliner to be built at the increased production rate of seven airplanes per month. The airplane, which rolled out earlier this week, is the 114th 787 to be built overall and the 100th 787 to be built at the Everett, Wash., factory.

Boeing’s 787 program is on track to achieve a planned 10 per month rate by year-end. The production rate accounts for airplanes built at the Everett Final Assembly facility, the Everett Temporary Surge Line and Boeing South Carolina.

To date, 50 787s have been delivered to eight airlines. The program has more than 800 unfilled orders with 58 customers worldwide.

A video feature on the rate increase can be found at this link: http://bit.ly/12iSIHa.


Learn more about:

About the author:
AVIATOR is an online source of market intelligence for the airline industry. We publish over 1,200+ news items per month with sources, making us the most comprehensive publisher of relevant airline data worldwide.